Balance Between Engineering, Intent and Constructability

Micron Technology, Inc. – Longmont

Micron Technology was a challenging project due to the relocation of Stulz CRAC (computer room air conditioner) units in a semi-occupied space. The rooms sometimes had electronics and laboratory equipment that weren’t moved completely out of the way. The coordination of the plumbing, electrical and duct-work above the ceiling was intense to navigate around the planned equipment below should any plumbing, refrigerant or condensate problems arise in the future.

mircon 4 mircon 3 micron 2

 

 

 

 

 

 

 

 

 

We also installed (5) Neptronic humidifiers and a Trane DDC (direct digital controls) for a new chiller and chilled water system.

1900 Pike Road

Longmont, CO

General Contractor: Golden Triangle Construction

Contract Price: $196,470

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Information

This entry was posted on September 16, 2014 by in Gallery and tagged , , , , , .
%d bloggers like this: