Although saying this is a jinx, this project is pretty straight-forward. General Contractor: Waner Construction Company, Inc Major Scope of Work: 5-ton up-flow split system AL29C flue piping for boiler Corrosion resistant chemical exhaust fan for pool equipment room Electric …
Month: September 2018

Regis Student Center Renovation
The location of the indoor air handling unit presented installation challenges of limited space and lifting the unit into the designated room. General Contractor: Golden Triangle Construction, Inc. Major Scope of Work: Trane indoor AHU with gas-fired heat, DX cooling, …