Regis Student Center Renovation

The location of the indoor air handling unit presented installation challenges of limited space and lifting the unit into the designated room.

General Contractor: Golden Triangle Construction, Inc.

Major Scope of Work:

  • Trane indoor AHU with gas-fired heat, DX cooling, VFD
  • Trane 25-ton air cooled outdoor roof mounted CU
  • Trane 60-ton VAV RTU with gas-fired heat, DX cooling
  • Custom mixing box for existing MAU

Regis Reno Room

Regis Reno AHU in place